Process control adjusts the condition of the imaging hardware to maintain a constant image density. Process control is executed at the following times.

 

Process Control

Operative Condition

Related SPs

1

PowerON ProCon :Set

When a certain time has passed after the previous job end

(Except when recovering from an SC or jam)

SP3-530-001

SP3-530-002

SP3-530-003

SP3-530-004

SP3-530-005

SP3-530-006

SP3-530-007

SP3-530-008

2

JobEnd ProCon:Set

When the value of the job end counter becomes more than the threshold

(At job end)

SP3-534-001 to 004

SP3-534-011 to 014

3

Interrupt ProCon :Set

When the value of the job interrupt counter becomes more than the threshold

SP3-533-001 to 004

SP3-533-011 to 014

4

Non-useTime Procon :Set

When the value of the non-use time counter becomes more than the threshold

SP3-531-001 to 005

5

Manual ProCon:Exe

When SP 3-011 is used

SP3-011-001 to 006

6

Toner End Recovery

After the Toner End Status is cleared (Recovery is NOT done in the near end status)

-

7

Initial Developer Setting Process Control

When the machine detects a new PCU or development unit

-