• When installing this option, turn OFF the main power and unplug the power cord from the wall socket. If installing without turning OFF the main power, an electric shock or a malfunction may occur.
  • This finisher is light and has a high center of gravity, so it easily topples when installing or moving it. Therefore, it is equipped with the stabilizer [A] attached to the left side of the finisher when shipped.

  1. After unpacking, immediately attach the stabilizer [A] to prevent toppling.
    Push it in thoroughly along the guide until it clicks.
  2. Remove the packing tapes and retainers, and then remove the accessories (screws, etc.).

  3. Open the front cover, and then remove the packing tapes and packing materials.

  4. Remove the fixing bracket [A] of the stapleless stapler unit.

    1. Remove the fixing screws.
    2. Pull out the bracket from the insertion part (marked in blue). (The bracket has been inserted into the stapleless stapler unit for alignment.)
    3. Pull out the bracket from the gap in the finisher's frame.

  5. Attach the shift tray [A] (×1: M4 × 8).

  6. Attach the relay guide plate in the following procedure.
    1. Temporarily attach the screw on the front side (3x6).
    2. Hook the relay guide plate [A] on the screw attached in step 1, then fully tighten the screw on the rear side (3x6).
    3. Fully tighten the screw on the front side.
  7. Clean the right side of the upper cover with a cloth moistened with alcohol, and then attach the cushion [A] to the finisher.
    Make sure that the cushion is aligned with the guide rib of the upper cover.

    If the internal multi-fold unit is installed on the main machine, cut off the section of the cushion indicated by the notch so that the cushion does not interfere with the I/F connector [A] of the finisher.


  8. Attach the ground plate [A] (3x6).
  9. Attach the joint bracket to the machine in the following procedure.

    1. Temporarily attach the screws on the lower screw holes (4x12).
    2. Hook the joint bracket [A] on the screws attached in step 1, then adjust the position so that the screw head comes to the center mark of the scale.
    3. Fully fix the joint bracket  (4x12).
      Tighten the joint bracket and bracket [A] of the bridge unit together.
  10. Remove the connector cover [A] on the right side of the main machine.
    When the Internal Multi-Fold Unit FD3010 is installed, it is not necessary to remove this cover.
  11. When the Internal Multi-Fold Unit FD3010 is installed, connect the finisher cable to the connector on the internal multi-fold unit.


  12. Remove the screw on the connection lever [A] and pull the lever.
  13. Connect the finisher to the main unit, and then push in the connection lever [A] to fasten it to the main unit. (x1)

    When the Internal Multi-Fold Unit FD3010 is installed, make sure that the finisher’s 2 cables are not crossing each other before you connect the finisher.
  14. When the bridge unit is installed, connect the interface cable to the machine.
  15. Attach the tray holder [A].
  16.  Close the front cover.
  17. Turn ON the main power.
  18. Deliver some A3/DLT paper to the proof tray and check if the vertical registration is correct according to the adjustment scale for A3/DLT paper (Side-to-side Registration Error (Finisher Registration Adjustment)).
  19. Check that the finisher can be selected on the operation panel, and check the finisher’s operation.